Administration centre PV public charging station in Changzhou

1. The project area is 1,300 square meters, and the construction of charging piles is 1,227kW, which can meet the charging requirements of 43 vehicles at the same time.

常州行政中心项目.png

2. Build a PV canopy of 142kW, with a daily power generation of 350kwh, which can save 160 tons of carbon emissions every year.

The project adopts the energy management system independently developed by Decent Power, and through the intelligent control strategy, the energy management and orderly dispatching of the energy system composed of photovoltaic system, charging pile group and power grid are carried out.

微信图片_20230519154658.png

The solar-storage integrated charging station is for when there is sunlight during the day, the PV panels convert sunlight into electrical energy for charging piles, and the excess electricity is stored through energy storage equipment. At night, the energy storage equipment is used to supply power to the charging piles to realize "low-carbon" or even "zero-carbon" operation of charging stations.